Aguasvivas Solar Plant located in Moneva, Zaragoza, Aragon

The Aguasvivas photovoltaic solar plant is located in the municipality of Moneva (Zaragoza), distributed across various plots in different polygons of the area. The project is promoted by the company Renovables Trillar, SL, which is listed as the owner and holder of the installation, of which Bruc Energy is the 100% owner. The confirmation of its environmental impact materialized with the favorable Environmental Impact Statement (DIA) issued on June 22, 2022, while the bulk of its construction (civil works, mechanical and electrical assembly) was developed and completed during 2024. According to RAIPEE, it entered operation in October 2024.

Access to the site is from the ZP-1173 road, through the Camino Azuara VP Moneva, which connects to the installation at its southern boundary. The plant has an inverter power of 46.76 MW and a grid access capacity of 41.4 MW.

The total investment of the project, including the plant, substation and evacuation line, amounts to approximately 22.58 million euros.

Ownership & Management

Current Owner

••••••

Market Subject

••••••

Grid Codes

UPP Code

••••••

UOF Code

••••••

UF Code

••••••

REE Connection Node

••••••

Detailed Location

Latitude

••••••

Longitude

••••••

Google Maps

••••••

Installation Type

••••••

Technical Specifications

Power

  • REE Access

    41.3 MW

  • Installed

    49.49 MW

Infrastructure

  • Surface Area

    97.6 ha

  • Location

    Zaragoza

Technology

Modules

••••••

Power per Module

••••••

Panel Configuration

••••••

Inverters

••••••

Configuration

With Trackers

Electrical Details

  • Max Vdc Voltage

    Unknown

  • Output Vac Voltage

    600 V

Connection Infrastructure

Substation

••••••

Additional Information

Panel Type

••••••

Commissioning

••••••

REE Connection / Evacuation Voltage

30kV

Additional Notes

estructuras mecánicas con un sistema de seguimiento solar este-oeste mediante un eje horizontal

Financial Information & References

Estimated CAPEX

••••••

Reference Links

••••••

Recent Performance

Performance Ratio (PR)

••••••

+2.1% vs previous month

Energy

••••••

Annual accumulated: 14.5 GWh

Estimated Revenue

••••••

Average price: 52.4 €/MWh

Capacity Factor

••••••

Zone average: 19.5%

Annualized ROI

••••••

Annualized (P48)

Payback Period

••••••

Based on estimated CAPEX

Revenue / MWp

••••••

Financial efficiency

Average Energy Price

••••••

Last month

Location

Information

Publication date

Tuesday, December 23rd, 2025

⚡ Solar Energy Generation Chart

💰 Revenue from Generated Energy Chart