Solar Photovoltaic Plant Guillena
The Guillena solar photovoltaic plant, located in the municipality of Guillena (Sevilla), is a project developed by Solarig and subsequently acquired by Luxcara GmbH, with a nominal capacity of 100 MW and an installed peak power of 121.07 MWp.
The complex connects to the grid through a 20/220 kV step-up substation, from which it evacuates the generated energy to the transmission electrical infrastructure.
The installation occupies several adjacent plots along the SE-3411 road, from where the main access is located.
The plant was built from 2019 onwards and has more than one hundred megawatts of photovoltaic modules that enable an estimated annual production exceeding 200 GWh, sufficient to supply 50,000 homes each year.
This infrastructure is integrated within the photovoltaic corridor of the Sevilla-Guillena-Salteras area, one of the most relevant solar hubs in Andalusia.
Ownership & Management
Current Owner
••••••
Market Subject
••••••
Grid Codes
UPP Code
••••••
UOF Code
••••••
UF Code
••••••
REE Connection Node
••••••
Detailed Location
Latitude
••••••
Longitude
••••••
Google Maps
••••••
Installation Type
••••••
Technical Specifications
Power
-
REE Access
100 MW
-
Installed
121.07 MW
Infrastructure
-
Surface Area
282.71 ha
-
Location
Sevilla
Technology
Modules
••••••
Power per Module
••••••
Panel Configuration
••••••
Inverters
••••••
Configuration
Fixed Structure
Electrical Details
-
Max Vdc Voltage
1,000 V
-
Output Vac Voltage
440 V
Connection Infrastructure
Substation
••••••
Additional Information
Panel Type
••••••
Commissioning
••••••
REE Connection / Evacuation Voltage
20kV
Additional Notes
Sin seguidores. Una estructura metálica fija, con una orientación sur y con una inclinación de 25º respecto a la horizontal. Estructuras de aluminio y acero SCHLETTER
Financial Information & References
Estimated CAPEX
••••••
Reference Links
••••••
Recent Performance
Performance Ratio (PR)
••••••
+2.1% vs previous month
Energy
••••••
Annual accumulated: 14.5 GWh
Estimated Revenue
••••••
Average price: 52.4 €/MWh
Capacity Factor
••••••
Zone average: 19.5%
Annualized ROI
••••••
Annualized (P48)
Payback Period
••••••
Based on estimated CAPEX
Revenue / MWp
••••••
Financial efficiency
Average Energy Price
••••••
Last month
Other solar plants in Sevilla
View full mapLocation
Information
Publication date
Thursday, October 16th, 2025