Solar Photovoltaic Plant Dulcinea
The PSF DULCINEA will be located in the municipality of Carmona, province of Sevilla, approximately 25 kilometers northeast of Sevilla and 8 kilometers northwest of the town of Carmona. It occupies plots located in polygon 6 of Carmona whose main use was previously agricultural, except for four plots considered public domain communication routes.
The plant is flanked by the A-462 highway (Villaverde del Río - Carmona) to the south, owned by the Junta de Andalucía, and by the SE-3201 highway (El Viso del Alcor-Los Rosales) to the east, owned by the Provincial Council of Sevilla.
Access to the plant will be through the road network of public and neighborhood roads in the area, which is reached from three existing connections on the SE-3201 highway. These three access points are paved and conditioned.
The initial budget for this plant was 25.09 million euros.
Ownership & Management
Current Owner
••••••
Market Subject
••••••
Grid Codes
UPP Code
••••••
UOF Code
••••••
UF Code
••••••
REE Connection Node
••••••
Detailed Location
Latitude
••••••
Longitude
••••••
Google Maps
••••••
Installation Type
••••••
Technical Specifications
Power
-
REE Access
80 MW
-
Installed
103.99 MW
Infrastructure
-
Surface Area
278 ha
-
Location
Sevilla
Technology
Modules
••••••
Power per Module
••••••
Panel Configuration
••••••
Inverters
••••••
Configuration
With Trackers
Electrical Details
-
Max Vdc Voltage
1,500 V
-
Output Vac Voltage
640 V
Connection Infrastructure
Substation
••••••
Additional Information
Panel Type
••••••
Commissioning
••••••
REE Connection / Evacuation Voltage
30kV
Additional Notes
El seguidor utilizado será un seguidor monofila, 2Vx42, con una separación entre filas (pitch) de 14,8 metros.
Financial Information & References
Estimated CAPEX
••••••
Reference Links
••••••
Recent Performance
Performance Ratio (PR)
••••••
+2.1% vs previous month
Energy
••••••
Annual accumulated: 14.5 GWh
Estimated Revenue
••••••
Average price: 52.4 €/MWh
Capacity Factor
••••••
Zone average: 19.5%
Annualized ROI
••••••
Annualized (P48)
Payback Period
••••••
Based on estimated CAPEX
Revenue / MWp
••••••
Financial efficiency
Average Energy Price
••••••
Last month
Other solar plants in Sevilla
View full mapLocation
Information
Publication date
Thursday, January 22nd, 2026