Solar Photovoltaic Plant Belvis I, II and III
In the municipality of Almaraz (Cáceres), three consecutive solar parks are developed promoted by Aldener Extremadura SAU under the names FV Belvís I, FV Belvís II and FV Belvís III. The first, FV Belvís I, has a peak power of 49.954 MWp and occupies approximately 85 hectares. The second, FV Belvís II, has a power of 49.974 MWp (with nominal power of 47.478 MWn) and an area of about 82.47 ha. Finally, FV Belvís III is smaller scale, with a peak power of 4.496 MWp and an estimated occupation of 8 hectares. These three parks share evacuation infrastructures, connecting through the “SET Belvís I, II and III” transformer substation and to the high voltage grid.
The official owner of the installation is the company Aldener Extremadura, which is 100% owned by China Three Gorges.
Ownership & Management
Current Owner
••••••
Market Subject
••••••
Grid Codes
UPP Code
••••••
UOF Code
••••••
UF Code
••••••
REE Connection Node
••••••
Detailed Location
Latitude
••••••
Longitude
••••••
Google Maps
••••••
Installation Type
••••••
Technical Specifications
Power
-
REE Access
94.8 MW
-
Installed
105 MW
Infrastructure
-
Surface Area
180 ha
-
Location
Cáceres
Technology
Modules
••••••
Power per Module
••••••
Panel Configuration
••••••
Inverters
••••••
Configuration
With Trackers
Electrical Details
-
Max Vdc Voltage
Unknown
-
Output Vac Voltage
Unknown
Connection Infrastructure
Substation
••••••
Additional Information
Panel Type
••••••
Commissioning
••••••
REE Connection / Evacuation Voltage
30kV
Additional Notes
Seguidores a un eje (norte-sur). Belvis 1 tiene 1304 seguidores a un eje (123 seguidores)
Financial Information & References
Estimated CAPEX
••••••
Reference Links
••••••
Recent Performance
Performance Ratio (PR)
••••••
+2.1% vs previous month
Energy
••••••
Annual accumulated: 14.5 GWh
Estimated Revenue
••••••
Average price: 52.4 €/MWh
Capacity Factor
••••••
Zone average: 19.5%
Annualized ROI
••••••
Annualized (P48)
Payback Period
••••••
Based on estimated CAPEX
Revenue / MWp
••••••
Financial efficiency
Average Energy Price
••••••
Last month
Other solar plants in Cáceres
View full mapLocation
Information
Publication date
Monday, October 27th, 2025