Stop wasting hours in Excel. Get your financial and technical analysis in seconds.Get started
Aerial view of Solar Photovoltaic Plant Cedillo

Solar Photovoltaic Plant Cedillo

Solar Plant Francisco Pizarro located in Cedillo, Caceres

The Cedillo plant—promoted by Iberdrola (Iberenova Promociones, S.A.)—was approved with an Environmental Impact Declaration in September 2022. It has an installed photovoltaic capacity of 374.9 MWp, positioning it as one of the emblematic solar mega-parks in Extremadura. It has an installed inverter capacity of 294.66 MW and an access capacity of 267 MW nominal in Red Eléctrica, capped by the transmission network node to which it connects.

According to official documentation, more than 900,000 panels were installed with a fixed structure (it does not have solar trackers, as can be seen in construction photos).

The plant was installed on a communal property of residents from the municipalities of Cedillo and Herrera de Alcántara (Cáceres), land that the owners maintain for livestock use, making agricultural-livestock activities compatible with photovoltaic operations.

In its construction, local suppliers such as Faramax, from Malpartida de Plasencia, which provided the transformers; IMEDEXA, from Casar de Cáceres, which contributed with the towers for the electrical evacuation line; or Ecoenergías del Guadiana, which was responsible for environmental studies, participated. Additionally, along with the construction of the solar plant, the “FV Cedillo” step-up substation was built, specially constructed to evacuate the energy generated by FV Cedillo.

In the satellite view, we see how the plant is subdivided into multiple areas. Furthermore, the areas are divided into fields of two types: 8,174.52 kWp and 8,456.4 kWp, corresponding to 4 inverters per field and capable of generating electricity at a level of 30 kV in three-phase alternating system.

The plant generates green energy of approximately 582,456 MWh/year, sufficient to supply around 178,000 households, and contributes to avoiding the emission of approximately 77,000 tons of CO₂ per year.

Ownership & Management

Current Owner

••••••

Market Subject

••••••

Grid Codes

UPP Code

••••••

UOF Code

••••••

UF Code

••••••

REE Connection Node

••••••

Detailed Location

Latitude

••••••

Longitude

••••••

Google Maps

••••••

Installation Type

••••••

Technical Specifications

Power

  • REE Access

    267 MW

  • Installed

    374.9 MW

Infrastructure

  • Surface Area

    484 ha

  • Location

    Caceres

Technology

Modules

••••••

Power per Module

••••••

Panel Configuration

••••••

Inverters

••••••

Configuration

Fixed Structure

Electrical Details

  • Max Vdc Voltage

    1,500 V

  • Output Vac Voltage

    Unknown

Connection Infrastructure

Substation

••••••

Additional Information

Panel Type

••••••

Commissioning

••••••

REE Connection / Evacuation Voltage

30kV

Additional Notes

Estructura fija. Sin seguidores. Estructuras fijas fotovoltaicas para soportar los módulos. Dos tipos de estructuras, 3V10 con 30 módulos por estructura y 3V9 con 27 módulos por estructura.

Financial Information & References

Estimated CAPEX

••••••

Reference Links

••••••

Recent Performance

Performance Ratio (PR)

••••••

+2.1% vs previous month

Energy

••••••

Annual accumulated: 14.5 GWh

Estimated Revenue

••••••

Average price: 52.4 €/MWh

Capacity Factor

••••••

Zone average: 19.5%

Annualized ROI

••••••

Annualized (P48)

Payback Period

••••••

Based on estimated CAPEX

Revenue / MWp

••••••

Financial efficiency

Average Energy Price

••••••

Last month

Location

Information

Publication date

Thursday, October 16th, 2025

⚡ Solar Energy Generation Chart