Solar Photovoltaic Plant Heliades
The HELIADES photovoltaic power plant is located in the municipal district of Pinoso (Alicante), specifically on a surface area of 9.94 hectares comprising plots 9, 53 and 54 of polygon 11 of the municipal district of Pinoso.
The plant has a nominal power (in inverters) of 4.928 MW and a peak power of 5.251 MWp. The investment cost, defined by the overall budget for the execution of the facilities, amounts to 1.85 M€.
The project is promoted by the company HELIADES FOTOVOLTAICA 1, S.L., which acts as both promoter and owner of the installation. Although the application was submitted in 2021, the administrative construction authorization was granted in December 2023, establishing a maximum period of eighteen months for the execution of the works. In the environmental field, it was confirmed in February 2023 that the plant does not affect forest land or protected areas, and according to current regulations, it was determined that the project does not constitute an activity subject to environmental impact assessment. The current 100% owner (sole partner) of Heliades Fotovoltaica 1 SL is Onda Renovables SL.
Access to the plant is from the CV-83 road, through one of the rural roads.
Ownership & Management
Current Owner
••••••
Market Subject
••••••
Grid Codes
UPP Code
••••••
UOF Code
••••••
UF Code
••••••
REE Connection Node
••••••
Detailed Location
Latitude
••••••
Longitude
••••••
Google Maps
••••••
Installation Type
••••••
Technical Specifications
Power
-
REE Access
4.5 MW
-
Installed
5.25 MW
Infrastructure
-
Surface Area
9.94 ha
-
Location
Alicante
Technology
Modules
••••••
Power per Module
••••••
Panel Configuration
••••••
Inverters
••••••
Configuration
With Trackers
Electrical Details
-
Max Vdc Voltage
Unknown
-
Output Vac Voltage
Unknown
Connection Infrastructure
Substation
••••••
Additional Information
Panel Type
••••••
Commissioning
••••••
REE Connection / Evacuation Voltage
20kV
Additional Notes
Seguidor a un eje. Estructura Hincado directo al terreno, sin cimentación.
Financial Information & References
Estimated CAPEX
••••••
Reference Links
••••••
Recent Performance
Performance Ratio (PR)
••••••
+2.1% vs previous month
Energy
••••••
Annual accumulated: 14.5 GWh
Estimated Revenue
••••••
Average price: 52.4 €/MWh
Capacity Factor
••••••
Zone average: 19.5%
Annualized ROI
••••••
Annualized (P48)
Payback Period
••••••
Based on estimated CAPEX
Revenue / MWp
••••••
Financial efficiency
Average Energy Price
••••••
Last month
Location
Information
Publication date
Friday, January 16th, 2026