Solar Photovoltaic Plant Gaetana
The Gaetana photovoltaic plant is a renewable energy generation project promoted by the company Gaetana Solar, S.L., linked to the Fotowatio Renewable Ventures (FRV) group. Located in the province of Badajoz, its main implementation is situated in the municipality of La Roca de la Sierra, although its evacuation infrastructure also extends through Mérida, La Nava de Santiago and Cordobilla de Lácara.
Access to the facilities is mainly through the rural road network connected with the regional highways that structure the La Roca de la Sierra area and the surroundings of the Los Canchales reservoir, from the EX-327 highway.
Originally, the project was conceived and processed for a capacity of 150 MWp (peak power) and 135 MW of nominal power. However, after requesting a project modification in March 2022, the General Directorate of Energy Policy and Mines granted a new administrative construction authorization that increased its capacity. Currently, the plant has a peak power of 180 MWp, an inverter capacity of 171 MWac and an access and connection capacity of 150 MWn.
This infrastructure is complemented by the Morantes step-up substation (30/220 kV) and an evacuation line that connects with the Carmonita node of Red Eléctrica de España.
Ownership & Management
Current Owner
••••••
Market Subject
••••••
Grid Codes
UPP Code
••••••
UOF Code
••••••
UF Code
••••••
REE Connection Node
••••••
Detailed Location
Latitude
••••••
Longitude
••••••
Google Maps
••••••
Installation Type
••••••
Technical Specifications
Power
-
REE Access
150 MW
-
Installed
180.05 MW
Infrastructure
-
Surface Area
250 ha
-
Location
Badajoz
Technology
Modules
••••••
Power per Module
••••••
Panel Configuration
••••••
Inverters
••••••
Configuration
With Trackers
Electrical Details
-
Max Vdc Voltage
Unknown
-
Output Vac Voltage
Unknown
Connection Infrastructure
Substation
••••••
Additional Information
Panel Type
••••••
Commissioning
••••••
REE Connection / Evacuation Voltage
30kV
Additional Notes
4.111 unidades de seguidores a un eje.
Financial Information & References
Estimated CAPEX
••••••
Reference Links
••••••
Recent Performance
Performance Ratio (PR)
••••••
+2.1% vs previous month
Energy
••••••
Annual accumulated: 14.5 GWh
Estimated Revenue
••••••
Average price: 52.4 €/MWh
Capacity Factor
••••••
Zone average: 19.5%
Annualized ROI
••••••
Annualized (P48)
Payback Period
••••••
Based on estimated CAPEX
Revenue / MWp
••••••
Financial efficiency
Average Energy Price
••••••
Last month
Other solar plants in Badajoz
View full mapLocation
Information
Publication date
Monday, January 19th, 2026