Solar Photovoltaic Plant Lirios Solar
The Lirios Solar photovoltaic plant is located in the municipality of Chucena, in the province of Huelva (Andalusia).
The promoter and holder of the authorization is the entity Solar Castuera, S.L., whose majority shareholder was BAYWA R.E. PROJECTS ESPAÑA, S.L.U. (BAYWA ESPAÑA).
The General Directorate of Energy Policy and Mines granted the prior administrative and construction authorization for this installation, including its evacuation infrastructure, through Resolution of April 21, 2023. The Environmental Impact Statement (EIS) for the project was previously issued, specified through Resolution of June 23, 2022. The installation is designed to have an installed capacity of 87.12 MW (nominal inverter capacity) and a peak power (MWp) of 99.97 MW.
The Lirios Solar plant takes its name from the area where it is located, one kilometer east of the urban center of Chucena, on seven plots with a combined area of 465.4 hectares. One of them, of 99.3 ha, is located in the municipality of Huévar del Aljarafe, although most of the facilities will be in Huelva territory. The overhead power evacuation line crosses the A-49 highway along its route.
Ownership & Management
Current Owner
••••••
Market Subject
••••••
Grid Codes
UPP Code
••••••
UOF Code
••••••
UF Code
••••••
REE Connection Node
••••••
Detailed Location
Latitude
••••••
Longitude
••••••
Google Maps
••••••
Installation Type
••••••
Technical Specifications
Power
-
REE Access
88 MW
-
Installed
99.97 MW
Infrastructure
-
Surface Area
420 ha
-
Location
Huelva
Technology
Modules
••••••
Power per Module
••••••
Panel Configuration
••••••
Inverters
••••••
Configuration
With Trackers
Electrical Details
-
Max Vdc Voltage
Unknown
-
Output Vac Voltage
660 V
Connection Infrastructure
Substation
••••••
Additional Information
Panel Type
••••••
Commissioning
••••••
REE Connection / Evacuation Voltage
30kV
Additional Notes
Seguiodres eje horizontal. Un total de 2.736 estructuras de seguidores
Financial Information & References
Estimated CAPEX
••••••
Reference Links
••••••
Recent Performance
Performance Ratio (PR)
••••••
+2.1% vs previous month
Energy
••••••
Annual accumulated: 14.5 GWh
Estimated Revenue
••••••
Average price: 52.4 €/MWh
Capacity Factor
••••••
Zone average: 19.5%
Annualized ROI
••••••
Annualized (P48)
Payback Period
••••••
Based on estimated CAPEX
Revenue / MWp
••••••
Financial efficiency
Average Energy Price
••••••
Last month
Other solar plants in Huelva
View full mapLocation
Information
Publication date
Friday, January 23rd, 2026