Stop wasting hours in Excel. Get your financial and technical analysis in seconds.Get started
Aerial view of Solar Photovoltaic Plant La Mula

Solar Photovoltaic Plant La Mula

La Mula Solar Plant located in the southeast of the municipality of Mula (Region of Murcia).

The La Mula solar plant, located in the southeast of the municipality of Mula (Region of Murcia), is the third largest photovoltaic project in Spain in terms of peak installed capacity. It has an installed capacity of almost 500 MWp and occupies more than 1,000 hectares.

Since the beginning of 2025, the Chinese company China Three Gorges (through its Spanish subsidiary) acquired 100% of the plant, reinforcing its commitment to the photovoltaic sector in Spain and Europe.

Access to the facilities is from the regional road RM-C3, and can also be accessed from the road that connects Barqueros with Albudeite from the RM-C1. Additionally, the plant is connected to the electrical system through the El Palmar transmission electrical substation (220/400 kV).

Annually, this installation generates approximately 750,000 MWh (0.75 TWh) of clean energy.

Ownership & Management

Current Owner

••••••

Market Subject

••••••

Grid Codes

UPP Code

••••••

UOF Code

••••••

UF Code

••••••

REE Connection Node

••••••

Detailed Location

Latitude

••••••

Longitude

••••••

Google Maps

••••••

Installation Type

••••••

Technical Specifications

Power

  • REE Access

    392.8 MW

  • Installed

    493.74 MW

Infrastructure

  • Surface Area

    1,050 ha

  • Location

    Múrcia

Technology

Modules

••••••

Power per Module

••••••

Panel Configuration

••••••

Inverters

••••••

Configuration

Fixed Structure

Electrical Details

  • Max Vdc Voltage

    Unknown

  • Output Vac Voltage

    Unknown

Connection Infrastructure

Substation

••••••

Additional Information

Panel Type

••••••

Commissioning

••••••

REE Connection / Evacuation Voltage

30kV

Financial Information & References

Estimated CAPEX

••••••

Reference Links

••••••

Recent Performance

Performance Ratio (PR)

••••••

+2.1% vs previous month

Energy

••••••

Annual accumulated: 14.5 GWh

Estimated Revenue

••••••

Average price: 52.4 €/MWh

Capacity Factor

••••••

Zone average: 19.5%

Annualized ROI

••••••

Annualized (P48)

Payback Period

••••••

Based on estimated CAPEX

Revenue / MWp

••••••

Financial efficiency

Average Energy Price

••••••

Last month

Other solar plants in Múrcia

View full map

Location

Information

Publication date

Thursday, October 16th, 2025

⚡ Solar Energy Generation Chart

💰 Revenue from Generated Energy Chart