Solar Plant Las Naranjillas
The Las Naranjillas solar photovoltaic plant, located in the municipality of Carmona (Sevilla), is a solar park of approximately 50 MWp of installed peak power. It was originally developed by Hanwha Energy, with more than 150,000 modules installed over an area of around 94 hectares.
In December 2020, the Irish group Amarenco acquired the plant from Hanwha Energy, marking its entry into the Spanish photovoltaic market. The installation is operated by GRS (Grupo Gransolar), which is also responsible for its maintenance (O&M) and has reported that the plant is performing above expectations.
Regarding access and grid connection: the administrative authorization for the electrical infrastructure (evacuation line) was granted to the company Las Naranjillas Energía, S.L.
It produces enough energy to supply about 14,000 homes and avoids the emission of nearly 52,000 tons of CO₂ into the atmosphere per year.
Ownership & Management
Current Owner
••••••
Market Subject
••••••
Grid Codes
UPP Code
••••••
UOF Code
••••••
UF Code
••••••
REE Connection Node
••••••
Detailed Location
Latitude
••••••
Longitude
••••••
Google Maps
••••••
Installation Type
••••••
Technical Specifications
Power
-
REE Access
48.7 MW
-
Installed
49.94 MW
Infrastructure
-
Surface Area
94 ha
-
Location
Sevilla
Technology
Modules
••••••
Power per Module
••••••
Panel Configuration
••••••
Inverters
••••••
Configuration
With Trackers
Electrical Details
-
Max Vdc Voltage
1,500 V
-
Output Vac Voltage
600 V
Connection Infrastructure
Substation
••••••
Additional Information
Panel Type
••••••
Commissioning
••••••
REE Connection / Evacuation Voltage
30kV
Additional Notes
Estructuras soporte de los paneles con seguidor instaladas con el eje de giro en dirección norte-sur con movimiento de giro en dirección este-oeste.
Financial Information & References
Estimated CAPEX
••••••
Reference Links
••••••
Recent Performance
Performance Ratio (PR)
••••••
+2.1% vs previous month
Energy
••••••
Annual accumulated: 14.5 GWh
Estimated Revenue
••••••
Average price: 52.4 €/MWh
Capacity Factor
••••••
Zone average: 19.5%
Annualized ROI
••••••
Annualized (P48)
Payback Period
••••••
Based on estimated CAPEX
Revenue / MWp
••••••
Financial efficiency
Average Energy Price
••••••
Last month
Other solar plants in Sevilla
View full mapLocation
Information
Publication date
Tuesday, November 25th, 2025